08 - 10 November 2016 // Nuremberg

Posting print layout

What information should be shown in the print layout?

Create print layout
Zoom product LOGO_Mechanical Installation

Mechanical Installation

LOGO_Mechanical Installation

Mechanical Installation

Request information Request information

Contact us

Please enter your personal information and desired appointment. You can also leave us a message.

Your personal information

Your message for us

Desired appointment during the exhibition

* Compulsory fields you must fill in.
Your message has been sent.

Would you like to use more facilities and advantages of the platform? Then please log in – or register here.

An error has occurred.

1. Installation of production equipment:

  • Assembling and installation of vessels out of sheets, pieces and its subsequent welding. (Usually we apply argon arc welding with shielding gas, semiautomatic welding).
  • Equipment positioning according to project documentation (pumps, board tanks, etc.)
  • Welding of pipelines of any diameter. For stainless steel pipes we use manual arc welding and gas (usually argon) is supplied into the pipeline. Argon is not supplied for carbon steel pipes. We use orbital welding to ensure the highest quality welding joints for the pharmaceutical industry.

2. Installation of filling lines (glass and PET bottles), packing lines. 

  • Equipment positioning according to project.
  • Installation of transporters and conveyers.
  • Installation of packing equipment of any type.
  • Deinstallation of used lines with subsequent marking, packing and transport to other companies (other country) and their installation and setting up at a new enterprise with yield of production capacity.

3. Installation of utility facilities equipment: 

  • Installation of equipment for cooler-compressor sections.
  • Welding of ammonia pipelines with subsequent ultrasonic or X-ray test.
  • Installation of carbon dioxide recovery stations.
  • Installation of air compressor plants.
  • Installation of ceiling-mounted air coolers

4. Installation of boiling equipment; 

5. Argon-arc welding of various materials (stainless steel, aluminum, copper, carbon steel + stainless steel, stainless steel + copper)

Electrical installation

LOGO_Electrical installation

Insulation works

LOGO_Insulation works

Manufacturing of stainless steel vessels

LOGO_Manufacturing of stainless steel vessels

There are no entries in your notes.

Show notes


The selected entry has been placed in your notes!

If you register you can save your notes permanently and access all entries even when underway – via laptop or tablet.

You can register an account here to save your settings in the Exhibitors and Products Database and as well as in the Supporting Programme.The registration is not for the TicketShop and ExhibitorShop.

Register now

Your advantages at a glance:

  • Advantage Save your notes permanently. Use the instant access to exhibitors or products saved – mobile too, anytime and anywhere – incl. memo function.
  • Advantage The optional newsletter gives you regular up-to-date information about new exhibitors and products – matched to your interests.
  • Advantage Call up your notes mobile too! Simply log in and access them at anytime.